SUCCESSFUL COOPERATION NO.1:
1. Our company knows the US CHAIN GROUP through the Canton Fair. Customers are very interested in the galvanized chain that is made by the company.
2. At July 18, 2017,PEERLESS CHAIN GROUP commissioned the Garrett couple to audit
The customer visited our company's cold drawing workshop, chain welding process, heat treatment process and quality control process.They were very satisfied and decided to go back and sign the contract.
3. At 2017-8-5, the two sides signed a cooperation contract, CHAIN GROUP initially ordered a container of goods, the production time is 40 days
4. At 2017-9-10, We finished the production of the chain, made packaging, and shipped these chains to Shanghai Port.

SUCCESSFUL COOPERATION NO.2:
1. . Our salesman, Henry, met the UK's METALCRAFT through the Internet. The customer was very interested in the mining chain made by the company. The two parties exchanged quality control and production process, and then we sent samples to the customer for confirmation.
2. The sample is acceptable. The customer came to China to participate in the Canton Fair in 2016 and also visited our company.
3. The customer was very satisfied with the entire production process and quality process of our company. David promised to reply to the contract as soon as possible
4. At 2016-6-8, the two parties signed a cooperation contract, METALCRAFT ordered 14 x 50 chain 1000 meters, 18 x 64mm chain 2000 meters, production cycle 35 days
5. We finished production on July 10, 2016, and them ship them to Qingdao Port.

SUCESSFUL COOPERATION NO.3:
1. In February 2015, we met the Japanese customers through the Alibaba promotion platform. Customers are interested in our anti-skid chain, and then let us ship four sets samples by DHL. The customer is satisfied with the quality after receiving the sample, but gave us some suggestions for surface treatment. Our production department listened to the customer, re-sampled it, and then shipped it to the customer by DHL. Customers confirmed second samples, and planned to visit our factory
2. In March 2015, Japanese client appointed four employees to verify the factory:
3. Both parties continued the discuss by mail, confirmed the production drawings, and the working process, quality control methods etc. In June, two parties signed contract.
4. We finished production on July 20, 2016, and them asked container to collect goods in our factory.

SUCCESSFUL COOPERATION NO.4:
1. In March 2014, we met the Indian company through the Internet. The customer is ready to purchase 16mm-42mm open link chain, the surface requires is hot-dip galvanizing, package is ton bag. The two sides firstly talked about the quality requirements, then talked about the price. After a month of communication, they were ready to order 60 tons of hot-dip galvanized open link chains that will be shipped by 3 containers, and asked to inspect the goods before shipment. The production time is 90 days and can be shipped in batches.
2. We produce 40 ton two container open link chain in 40 days. Customers asked us to ship the chain at first and inspect it on May 5, 2014. We pick up the customer at the airport and the customer is very satisfied with the inspection.
4. We shipped two containers open link chains to Qingdao port in May 15, 2014. and ship the last container to port in June 25, 2014.

SUCCESSFUL COOPERATION NO.5:
1. In January of 2013, the Spanish customer was very interested in the our grade 80 lifting chain, 4.5 times safety factor, 2.5 times proof test, chain hardness 38-42HRC. Both parties communicated prices, working process, production drawing, quality control and packaging matters via E-mail.
2. In February of 2013, the customer inspected the factory by Xinzheng Airport even if it was snow at that time. The customer was very satisfied with the company's production scale and quality process, and agreed on the purchase quantity as discussed before.
2. Spain customers sent a purchase contract after returning back country, ordered 6mm 2000 meters, 8mm: 3500 meters, 10mm: 1000 meters, load port is FOB Shanghai, lead time is 40 days.
3. We successfully finished the production according to the agreement and delivered it to Shanghai Port.

